Countdown to Baja: 14 Days!

It’s getting real.  Only two weeks left.  This weekend with Ann’s help we completed the following:  Varnished the brightwork on the cabin top, fixed the manual bilge pump including installing a new section of hose (problem was a jammed filter.  Flushed and cleaned it several times), pulled all the chain out of the stb’d anchor and all the rope out of the port anchor and labelled every ten feet, changed the oil and the oil and fuel filters on the engine.  Good effort.  Some more stuff to go, but getting there.Varnish Time     Floorboards up     In the bilge

Leave a Reply

Your email address will not be published. Required fields are marked *


5 + = eleven